Application Application Case 01 APPLICATION : metropolitan area MIGEUM S/S 345kV ��100MVAr STATCOM TRANSMISSION MAP BACKGROUND How to overcome difference between power Metropolitan KEY supply and demand in metropolitan area? T N E SVC STATCOM M 80 E L P P 70 U S 60 Supply 50 & 40 30 42/ 23 6 / 12 Demand 20 10 0 Demand Supply Demand Supply 12 / 19 metropolitan None-metropolitan 32/ 26 Metropolitan ? Occupied 23% of power-supply Case ? Focused on 42% of power-demand 8 / 20 ? Use of high unit-price fuel on generation in 765kV Line 345kV Line metropolitan area, such as LNG & oil & etc.. DC�� 180kV Substation Regional 765kV Substation Power Plant ? Use of low unit price fuel on generation in 345kV Substation non-metropolitan area, such as Nuclear & Demand(%) Supply(%) Power Plant Bituminous, & Anthracite(Hard coal) & etc.. �� Improvement of voltage stabilization CUSTOMER �� Prevention of blackout NEEDS �� Adopting an eco-friendly Equipment �� Improvement of voltage-stability ? By dynamic reactive-power compensation �� Transmission-capacity expansion ? Maximazing available active power without new installation of generator EFFECTIVENESS ? Relaxing restriction on inflow of power-flow in metropolitan area by dynamic reactive-power compensation �� Economical operation of power transmission ? An decrease of 300MW generation per year FACTS based on IT SOLUTION - Migeum ��100MVA STATCOM (2009) I 12 13 STATCOM STATic Synchronous COMpensator
APPLICATION : an isolated JEJU island 02 Shin-Jeju S/S 154kV ��50MVAr STATCOM Han-la S/S 154kV ��50MVAr STATCOM CUSTOMER NEEDS Securing available reactive power in Jeju power system Expansion of reserve margin WAYS TO SOLVE �� Improvement of system stability and power quality - Steady state and dynamic voltage control - Reactive power control of dynamic loads EFFECTIVENESS - Renewable energy source �� Optimization of system performance in power grid interconnected by HVDC - High reliability under system contingencies - Voltage regulation from injection of HVDC filter Jeju-Haenam HVDC #1(1997.11) : 150MW * 2, DC + 180kV HVDC LINK Jeju-Jindo HVDC #2 (2012.9) : 200MW * 2, DC + 250kV �� Assume that the Southern-Jeju steam power plant drop out �� After a failure happen, the simulated result is as below. (Vref = 1P.U.) None FACTS �� Voltage drop : 0.5P.U SVC �� Voltage drop : 0.35P.U. (during 0.3s) STATCOM �� Voltage drop 0.25.U. (during 0.1s) Bus Voltage SIMULATION 1 0.75 0.50 0.25 0 0 2.5 5 7.5 10 Multiple FACTS Control ? SOLUTION ��Shin-Jeju S/S ��50MVAr STATCOM (2011) ��Han-la S/S ��50MVAr STATCOM (2011)