Engineering Hyosung’s turnkey solution starts with our engineering capability. Our engineering scope ranges from basic design to detailed calculation. We advise our customers optional designs that can reduce cost and increase efficiency. At Hyosung, we make sure that no component comprising the substation is overlooked. We have numbers of experienced engineers specialized in each individual equipment. To guarantee that our customers are receiving the highest level of quality, we operate Reliability Engineering Center in Korea where we improve the design and analysis technology and develop test and assessment technology. Engineering Scope · Basic Design Drawing · Cable Calculation · System Logic Diagram · Short Circuit Current Calculation · Current Transformer / · Protection Relay Setting Calculation Voltage Transformer Calculation · Cable Block Diagram & Schedule · AC/DC Capacity Calculation · Installation Drawing · AC/DC Circuit Design · Installation and Operation Maintenance Manual · Earthing Calculation & Plan · Site Inspection and Testing Procedure Manual · Lighting Calculation · As Built Document Optimum Solution Proposal Site Survey Conceptual Design Economic Evaluation System Analysis •Site Selection •Insulation Coordination •Capacity Estimate •Stability Analysis •Interface Structure •Current Transformer •AIS/GIS Type •Harmonic Analysis Check Calculation Selection •Voltage Drop Analysis •Connected Equipment •Battery Calculation (Comparison & •System Surge investigation •Cable Size Analysis) Analysis Calculation •System Efficiency Improvement
Engineering Tools ETAP EMPT MS Project Reliability Engineering Center Detailed Designing Process Project LOA Receipt Contract Document Inspection Engineering Schedule •Study of Lighting/Switching •Schedule Detail Organization Surge (EMTP) (MS PROJECT) •Study of Insulation •Resource Arrangement Coordination (EMTP) (MS PROJECT) Approval Document Purchase OrderPurchase Order Substation Engineering •Cable Support Calculation •Battery/Charger Calculation •Grounding Calculation ( ETAP) (ETAP) (ETAP) •Conductor Sizing Calculation •Cable Sizing Calculation (ETAP) (ETAP) Equipment Inspection Installation Drawing As-Built Drawing ヲUCurrent Transformer Calculation (ETAP)